The current pair of cloisters is perfectly identical; each Cloister has a square plan with ca. 25 m on the side, and ceiling height of ca. 12.5 m.
Main materials: mixed masonry, plaster and painted stucco, marble, tiles.
Measurement points and source location
The sound source was placed in the centre of the Cloister (S1), and in an intermediate position in the south corridor (S2). The acoustic acquisitions and recordings were carried out in two locations, the first inside the Cloister (Pos1) and the second in an intermediate position in the north corridor (Pos2).
Demo Audio Files
“Male and Female speech” -> Original
“Male and Female speech speech” -> Processed in Stereo
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s
“Male and Female speech speech” -> Processed in Binaural (to use headphones)
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s
“Guitar_Capriccio_Arabe_Tarrega” -> Original
“Guitar_Capriccio_Arabe_Tarrega” -> Processed in Stereo
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s
“Guitar_Capriccio_Arabe_Tarrega” -> Processed in Binaural (to use headphones)
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Original
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Processed in Stereo
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Processed in Binaural (to use headphones)
Acoustic Source in the middle of the Cloister (S1) and Acquisition System in Position 2; T30,wide = 2.90 s