The Cloister has a polygonal floor plan with sides of approximately 50 m and a ceiling height of approximately 10 m.
Main materials: mixed masonry, limestone stonework (lioz), glass.
Measurement points and source location
The sound source was placed next to the wall of the Cloister that delimits the deambulatory of the church (S1). The acoustic acquisitions and recordings were carried out in 5 locations, the first 3 located in the courtyard of the Cloister (Pos1, Pos2, Pos3), and the remaining 2 located respectively in the Chapels of Nossa Senhora da Piedade da Terra Solta and Santo Estevão (Pos4, Pos5), next to the east corridor.
Demo Audio Files
“Male and Female speech” -> Original
“Male and Female speech speech” -> Processed in Stereo
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s
“Male and Female speech speech” -> Processed in Binaural (to use headphones)
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s
“Guitar_Capriccio_Arabe_Tarrega” -> Original
“Guitar_Capriccio_Arabe_Tarrega” -> Processed in Stereo
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s
“Guitar_Capriccio_Arabe_Tarrega” -> Processed in Binaural (to use headphones)
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Original
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Processed in Stereo
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s
“Kyrie_Missa_Notre_Dame_Guillame_de_Machaut” -> Processed in Binaural (to use headphones)
Acoustic Source next to the wall of the Cloister that delimits the deambulatory of the Church (S1) and Acquisition System in Position 3; T30,wide = 2.43 s